Wednesday, August 01, 2007

The Eds have been doing alot of work on the first floor trim. They have been mostly working on the Crown Moulding in the Dining Room.


Joe has been doing alot of work at the Site. He has most of the front yard close to a finish grade. Around back we are going to need to have more fill brought in.

Ed trimmed out the Tub in the Master Bath. We used Azek beadboard so we don't have to worry about it getting wet.

Here is the wood for the first floor trim. At least 50% of it.


Dad and I took a spin up to Gilbertsville to pick up a good chunk of the trim package for the first floor.

Most of the Tile for the house is sitting in the garage waiting to be installed.