Wednesday, June 27, 2007

The Eds have been busy hanging the interior doors.
Dining Room into the office

Toy Room Closet

Back Hall Coat Closet

MudRoom Coat Closet
Mudroom Door
Mudroom
Top of the Back Stairway - Closet and Attic Stairs
The upstairs trim was also delivered and they should be moving upstairs to begin doing the window and door trimming out.

Thursday, June 21, 2007

Today we received the second shipment of doors. These are all the doors for the first floor. The wood for the upstairs trim was supposed to milled today. Hopefully it will get delivered next week.






Wednesday, June 20, 2007

Wednesday was a Big Door Day. The garage Doors and Openers were installed today. They were delivered without the lights we ordered in the top panel so the installers will need to return when those panels come in.
The Trim guys (Ed & Ed) started today. They began by hanging the "Pre-Hung" doors. apparenttly the definition of pre-hung is different in Pennsylvania then it is in New England as all the door jambs and Hinges came as loose parts - Some assembly required. The Eds got all of the upstairs doors hung in their jambs. The First Floor Doors are expected to be delivered on Thursday.

Monday, June 18, 2007

Dad and I installed some drainage pipes along the front of the house to collect the rainwater runoff from the roof.


Joe D is back on the job and has been starting to set the final grades. We can now start to see what our yard will eventually look like.





Thursday, June 14, 2007

Things are starting to happen again. This week we got the A/C installed. We also got the basement ceiling insulation installed.


Joe wanted me to add this moth found in the Garage to the Blog