Tuesday, May 29, 2007

Project Links
This post is of some links I used for the project.
Interior Doors: Very Satisfied - They are just what we wanted
http://www.solidhardwooddoors.com/
Windows:
http://www.kolbe-kolbe.com/
Stair Components: Great material
http://www.alwoodwork.com/
HW Flooring - Trim Pkg - Good material but not good at delivering on time and very difficult to resolve problems with.
http://www.srwoodworking.net/
Hardwood Flooring Install:

Kitchen/Bath Design: Awesome to work with.
http://www.metrowestdesignworks.com/
Kitchen Cabinets: TBD
http://www.platowoodwork.com/
Dad and I spent Wednesday prepping the gravel pad for the A/C compressor units. I need to get these units installed as the wood for the floors was also delivered today. I need to prevent the floors from getting exposed to too much humidity. We also worked on spreading the gravel under the front porch.

Joe lent a hand spreading the gravel under the front porch.



About 60% of the material for the hardwood floors was delivered on Wednesday.

We are also begining to test out some paint colors.

Saturday, May 19, 2007


Here is another Catch All Post - We are finished getting the house primed inside. The ceilings were painted with a finish coat and the walls were just primed. Dad and I have been working on blocking out the front porch so we can lay the deck boards down perpendicular to the house. We are kind of dead in the water as we wait for materials to be delivered. We expect the interior doors at the beginning of June and the trim package should show up shortly after that. Then we can really start working again. Weekends are busy trying to find ways to keep the kids entertained at the lot so we can get some work done.










Add Image
Joe's Guys have been putting some time in on the back Patio Retaining wall.


The Insulation guys returned to install the Iceneyne under the kids bathroom.