Eric's guys finished up the roof over the bumpout in the toy room and also worked on trim and interior walls.
New Address: 72 West Elm St Hopkinton MA 01748 PH: Remains the same 497-0732

Here is the view from the Main attic looking back at the roof of the garage over the entrance from the stairs.





Here is Mom and Joe in the unfinished room over the garage.

The Kids Bathroom:
The Attic Stairs Started:
Garage Gable End and Dormers:







This morning the lumber for the second floor walls and the roof was delivered: 

Due to the extreme heat the framers could only work half a day. They still managed to get some of the second floor walls up. 




We were also surprised by someone dropping of a load or two of clean fill. I guess the sign we put up earlier in the week is starting to work.



Back view of the house taken from the top of the Garage: 
This is the opposite picture looking back from over the toy room back towards the garage:
The picture below is of the kids bedrooms and bath:
Here are the main stairs for the house:
Here are the back stairs:
The front room will cantilever out into the roof of the front porch:
The garage is starting to take shape:
The framers were able to move the concrete cutouts so they don't get in the way of the cement floor guys who are expected next week:
We were fortunate to receive some free fill from a local person who is having an inground pool installed. We need about 10 more pools to get us close to where we need to be for fill: