Wednesday, December 20, 2006

The site was real busy today. There must have been a dozen work trucks. Kevin Lobisser and his workers were pouring the concrete footings for the back deck. Jim Melnick was installing the service wiring from the meter socket to the main panel in the basement. Kyle and John continued to wire the inside of the house, And I met with Pauline our Kitchen designer. Hopefully this means that things will start moving along quicker now.

Monday, December 18, 2006

The last couple of weeks have been mostly wiring. We also needed to install another 4" Pipe to the street so NStar can get the electric service to our house. This required alot of rework. This is the platform and grounding rod for the Transformer.Kyle and John have the house ~ 80% Wired. Dad has been working every Saturday since he got home from Florida. (Going back to Florida this year is going to be a bit more attractive then normal) This weekend we built the landing in the garage for the garage door. We also have started closing up the garage door openings with Blue tarps to help keep the cold out.

We had the apron of our driveway put in to make it cleaner for the Winter. It is just a rough coat which goes in about 40'.

T&J did some additional installation work on the furnace. It is small on the inside and small on the outside. This is the exhaust and the intake for the furnace. Barely noticable on the side of the house.

Here is Laura on the newest Tool on the site.